FAQ: energy, BMS and the separation from wall-i

The questions we are asked most often, with direct answers and no unnecessary jargon.

Understanding metering, MCR and BMS

What is MCR (measurement, command, regulation)?

MCR covers all equipment and automation that measures, commands and regulates a building's technical systems (heating, ventilation, air conditioning, plumbing). It ensures operation, comfort and energy performance of HVAC installations. Depending on the region and the document, the same services appear as MSR (German-speaking Switzerland) or I&C (instrumentation and control).

What is the difference between MCR and BMS/BAS?

MCR works at plant level: the sensors, actuators and controllers that drive each piece of equipment. The BMS (Building Management System, also called BAS) centralises, visualises and coordinates all of these installations from a single workstation. MCR is the field, the BMS is the conductor. Specifications in French-speaking Switzerland also refer to GTB, GTC (centralised technical management) or GTE (technical energy management), and German ones to GLT or GA: the scope is the same.

What is energy monitoring, and how does it differ from a BMS?

A BMS controls and supervises the installations; energy monitoring measures and analyses what they consume. The first answers the question “is the installation working?”, the second “how much does it consume, and why?”. Both can share the same meters and protocols (M-Bus, Modbus, BACnet), but monitoring can also be installed in a building with no BMS. See our energy monitoring page.

What is the BACnet protocol and why does it matter?

BACnet is an open, standardised communication protocol (ISO 16484-5) dedicated to building automation. It allows equipment from different manufacturers to communicate with each other: guaranteed interoperability, no dependence on a single supplier, easier upgrades. For monitoring, it is also the guarantee of being able to read an installation’s data without going through its manufacturer.

Does equipment advertised as “BACnet compatible” actually interoperate?

Not necessarily. “BACnet compatible” says nothing about what is actually implemented. What commits a supplier is its PICS (the document declaring the objects and services supported), its BTL certification, which independently verifies those declarations, and the BIBBs required in the specification. A tender document that simply asks for “BACnet” opens the door to equipment that communicates poorly, or not at all, with the supervision layer. A serious specification therefore requires the PICS, the BTL certification and the EDE file of the points list.

BACnet, KNX, Modbus, M-Bus, OPC UA: should a single protocol be imposed?

No, and it is rarely desirable. Each protocol has its own field: BACnet for HVAC automation and supervision, KNX for lighting and blinds, Modbus and M-Bus for meters and plant equipment, OPC UA for exchanges with operational IT. What matters is that each protocol is open and documented, and that the gateways between them are defined at the design stage, not improvised at commissioning.

Can repeated writes over the bus wear out a device?

Yes. Many drives and controllers store the setpoints they receive in non-volatile memory, which has a limited number of write cycles. A supervision system or gateway that rewrites the same value every second can exhaust that memory long before the device’s expected end of life, and the device then fails for no apparent reason. These writes also load the network for nothing. A protocol audit measures who writes what, how often, and whether the value actually changes.

What exactly does a BMS supervision layer do, and what does it not do?

It displays, alarms, logs and configures. It does not control. Control runs in the controllers and the local regulators, and it must keep running with the server switched off. Supervision is the layer above: graphics, alarm acknowledgement, trend curves and historical data, schedules and calendars, setpoints, user management, reports, remote access. That boundary belongs in the specification: otherwise one bidder prices a system that displays and another one that drives sequences, and the two bids stop being comparable. We set the split out in our article on tendering a supervision system.

What is a building's automation class?

SN EN ISO 52120-1 (SIA 386.111) groups control and building management functions into four classes, from D (non-efficient) to A (high performance). Class C is the reference. Each class corresponds to a level of function per domain: heating, cooling, ventilation, lighting, blinds. It is decided at preliminary design, because some of these functions depend on architectural choices: motorised solar shading, lighting zoned by daylight, presence detection per room.

Which automation class should new offices aim for?

Class B is the right starting point. In a worked case, new 6,500 m² offices in Sion heated by a heat pump, it delivers 59% of the class A saving, i.e. CHF 6,660 a year less than class C. Class A is justified if its extra cost over B stays below CHF 45,500, i.e. ten years of additional saving. The full calculation is in our article The building automation class is decided in the brief.

Workswell and wall-i

What services does Workswell offer?

Seven areas: energy data acquisition, energy monitoring, energy audit and consulting, protocol audit (BACnet, KNX, Modbus, M-Bus), Wellset solutions, custom development in software and electronics, and the cybersecurity of our solutions according to IEC 62443. From 1 January 2027, MCR/BMS design, BAMO, MCR audits and tender writing are provided by wall-i.

Why is Workswell separating its activities?

Because writing specifications on the one hand and selling products on the other, within the same legal entity, kept an ambiguity alive. wall-i, a separate company founded by Tobias Bétrisey and Jérôme Savioz, takes over the MCR/BMS engineering firm activity and sells neither licences nor products. Workswell keeps monitoring, energy consulting and product development, including Wellset. Everything is explained on the why two companies page.

Does my mandate in progress change contact?

No. Mandates signed with Workswell Sàrl are carried through to completion by Workswell, with the same team. No file is transferred midway.

What happens to BAMO and the KBOB and BACnet tools?

They belong to specification work. BAMO, like MCR design and tendering, is provided by wall-i from 1 January 2027. The KBOB address generator and the BACnet object reference are moving to wall-i.ch: their current pages show their new location.

Working with Workswell

Do you need a BMS to do energy monitoring?

No. Monitoring relies first on the existing meters (electricity, heat, water), supplemented where metering is missing. In a building equipped with a BMS, it reuses the BMS data, provided they are accessible through an open protocol. In both cases, the starting point is an inventory of the available metering points.

Do you work on installations from other brands?

Yes, that is the most common case. We connect meters and installations of any brand, as long as they communicate through an open or documented protocol (M-Bus, Modbus, BACnet, KNX). Technical acceptance and inspection of an installation built by a third party, on the other hand, belong to specification work, provided by wall-i.

Do you offer solutions to modernise existing installations?

Yes, on the product side. Wellset offers WS-PCD, which takes over the connectors of SAIA PCD1 and PCD2 controllers directly, and EC-SWAP, which converts an asynchronous ventilation motor to EC while keeping the existing control, without reprogramming the controller. The design of a complete retrofit and site supervision are provided by wall-i.

How are your fees established?

On the basis of a scope defined in writing, as a fixed fee or on a time basis depending on the nature of the mandate, with reference to SIA regulation 108 for engineering services. You receive a detailed offer before any commitment, distinguishing the services included from those that remain optional. For Wellset products, the net quote is issued on wellset.ch within 24 business hours.

Is Workswell independent from manufacturers?

Yes. Workswell has no commercial ties with any manufacturer or integrator: our measurements and recommendations do not depend on any catalogue. Workswell does, however, develop its own products under the Wellset brand. This is precisely why specification work, that is, writing specifications, is entrusted to wall-i, a separate company.

Which region does Workswell serve?

Workswell is based in Sion and works mainly in Valais and throughout French-speaking Switzerland. Wellset products are shipped throughout Switzerland.

Standards and cybersecurity

Do your services comply with SIA standards?

Yes. Our audits and reports are based on the SIA standards in force. Applying the KBOB and SBAT guidelines in public tender specifications belongs to specification work, provided by wall-i.

What is the KBOB BACnet recommendation and who has to apply it?

The KBOB, the coordination conference of the construction and property bodies of Swiss public clients, publishes a recommendation on the use of BACnet in buildings: object naming, addressing structure, points lists, documentation to be delivered. It is the reference for buildings owned by public clients and appears more and more often in private specifications, because it makes an installation comparable, verifiable and transferable to another integrator. The address generator and the BACnet object reference derived from it are moving to wall-i.ch.

What do IEC 62443 and the Cyber Resilience Act change?

IEC 62443 structures the cybersecurity of industrial and building automation systems: segmentation of OT and IT networks, device authentication, access logging, update management. The Cyber Resilience Act applies from 11 December 2027: every connected product placed on the European market will have to comply, with security updates guaranteed for at least five years. For a manufacturer like Workswell, it applies directly to its products; for an operator, the controllers and gateways chosen today must already anticipate it. See our cybersecurity of our solutions page.

Who should own the source code of my controllers?

The building owner. Without commented source code, the configuration files and the tools needed to modify them, you remain dependent on a single provider for the slightest change or correction. A serious specification requires the handover of source code, licences and complete documentation, so that you can develop your installation with the integrator of your choice.

Does the law require an automation class?

No. MuKEn, the cantons' model energy regulations, requires consumption metering in new non-residential buildings (from 5,000 m² in the 2014 edition, from 2,000 m² in the 2025 edition) and, in its optional module 14, demand-controlled regulation. No edition sets a class: that choice remains with the building owner, who should write it into the brief, domain by domain. The four decisions to take at preliminary design are set out in our article on the automation class.

Funding and subsidies

Can a ventilation retrofit be subsidised?

Yes, but on a condition that surprises everyone: the measure must not be too profitable. ProKilowatt, the Swiss Confederation's competitive tendering scheme, covers up to 30 % of the investment cost of an electrical efficiency measure, and funds only what would not happen without it. A measure with a payback below four years is deemed economically viable, and it is not supported. There are two routes: the individual project, from CHF 70,000 of investment, and enrolment in an existing programme for standardised measures. Thresholds, deadlines and the documents required are set out in our article on ProKilowatt and the four-year threshold.

Why is a profitable measure not subsidised?

Because a subsidy exists to trigger what would not happen otherwise. On ventilation, the difficulty is that the best retrofits sit precisely on the profitable side of the threshold: a drive often runs 4,000 to 6,000 hours a year, and fan power varies approximately with the cube of the airflow, which makes this the item where a modest reduction produces the largest gain. The four-year threshold is therefore not an obstacle to work around but a sorting criterion: below it, you carry out the work without applying; above it, the scope extends beyond the motor (wiring, controller, reprogramming, a new handover) and an application makes sense.

When does a subsidy application have to be filed?

Before any commitment. Only measures not yet implemented are supported, and implementation starts before the site work: it includes the unconditional decision to proceed, signing the contracts and ordering the equipment. You therefore have to wait for the award decision before ordering. The direct consequence on ventilation: a motor that fails on a Tuesday morning is not a subsidy application, because the replacement will be ordered the same day, and like for like. The subsidy is only available for anticipated renewal, the kind decided while the plant is still running.

How is payback calculated on a ventilation application?

On three quantities, and this is where applications go wrong: the actual operating hours rather than the theoretical time schedule, the power actually absorbed rather than the nameplate rating, and the current airflow rather than the one in the acceptance file. The three errors do not all point the same way: combined, they can overestimate the saving just as easily as halve it. Overestimating earns a good ranking, then a problem at verification; underestimating leads to abandoning a project that would have cleared the threshold. Monitoring that already logs these quantities makes the exercise almost free; otherwise, an energy audit and a measurement campaign before the works are better than an assumption to be defended later in front of an inspection.

Is there any funding other than ProKilowatt?

Yes. Since 2026 a second federal instrument targets the same potential: efficiency gains by electricity suppliers, which assign every distributor above a certain size a quantified savings target to be achieved among its end consumers; ventilation and drives appear there as standardised measures. Cantonal programmes come on top, with conditions that vary from one canton to the next. The schemes cannot be combined and the choice is made before ordering, which makes it the first question to settle rather than the last. We have not yet handled an application under the electricity suppliers' instrument.

Access and contact

What is the client area for, and how do I get access?

The client area gives access to your project documents: reports, points lists, acceptance files, operating documentation. Access is personal and compartmentalised: each client sees only their own documents. We issue the credentials; if you have trouble signing in, write to info@workswell.ch.

How can I request a quote or advice?

By phone on +41 27 326 60 00, by email at info@workswell.ch or via the contact form. We study your needs and propose an approach tailored to your project: a first conversation commits you to nothing. For a Wellset product, quote requests are made directly on wellset.ch.

Energy, MCR, BMS & BACnet glossary

The acronyms that come up most often in energy reports, specifications and acceptance files.

AcronymMeaning
AHUair handling unit, the ventilation plant (UTA in French, RLT in German)
AMO / BAMOowner's engineer: mandate to represent the building owner on technical matters
BACnetopen, standardised communication protocol (ISO 16484-5) for building management systems
BIBBsfunction blocks a device can implement (client A / server B)
BMS / BASBuilding Management System / Building Automation System
BTLBACnet Testing Laboratories: independent certification that verifies the PICS declarations
COVChange of Value: a BACnet notification sent as soon as a value changes, instead of cyclic polling
CRACyber Resilience Act: EU regulation applying from 11 December 2027 to connected products
ECelectronically commutated motor: variable speed and high efficiency, an alternative to the asynchronous motor
EDEEngineering Data Exchange: tabular file format for exchanging a BACnet points list
Energy signaturerelationship between heating consumption and outdoor temperature: the reference that reveals a drift
GLTGebäudeleittechnik, the German term for a building management system
GTB / GTCFrench terms for a building management system, respectively centralised building management
HVACheating, ventilation and air conditioning (CVC in French, HLK in German)
IEC 62443cybersecurity standard for industrial and building automation systems (CEI 62443)
KBOBcoordination conference of the construction and property bodies of Swiss public clients
KNXstandardised protocol for lighting, blinds and room comfort
M-Busprotocol for reading energy meters, wired or wireless
MCRmeasurement, command, regulation (MSR in German, I&C in international usage)
Modbuswidely used serial and IP protocol found on plant equipment
MS/TPRS-485 serial link, as opposed to BACnet/IP
OPC UAsecure exchange protocol between automation and operational IT
OToperational technology: controllers and technical networks, as opposed to office IT
PICSdocument describing what a device actually supports in BACnet
ProKilowattthe Swiss Confederation's competitive tenders for electrical efficiency (art. 19-22 EnO)
SIASwiss Society of Engineers and Architects, publisher of the standards and fee regulations
VAVVariable Air Volume: control by variable airflow, from the terminal box to the air handling unit