Open a belt-driven AHU casing after ten years: the black dust on the floor is your belt
Around 4% of losses in the belt transmission and 10% in the asynchronous motor. EC-SWAP replaces the whole assembly without touching the controls or the wiring.
Analysis

The result: missing measurement points, controls that don’t talk to each other, surprises at commissioning.
Our role: coordinate upstream.
Design office, ventilation installer, heating and cooling producer, electrician — everyone works better when the controls interfaces are scoped from the start.
With years of experience in ventilation, controls, electrical and heating systems, we analyze the systems, advise the stakeholders, scope the interfaces and support the controls contractor.
The end goal stays the same: an operator who runs their building without unpleasant surprises, regardless of who was involved.
Have a project where controls need to be scoped from the design stage? Let’s talk.
Also worth reading

Around 4% of losses in the belt transmission and 10% in the asynchronous motor. EC-SWAP replaces the whole assembly without touching the controls or the wiring.

A 0-10 V setpoint and a 0-10 V feedback signal work, but that is all. A bus-connected VAV box gives you thresholds, actual damper position and remote adjustment.

Network segmentation, device authentication, access logging: IEC 62443 already covers most of the Cyber Resilience Act requirements, applicable from 11 December 2027.
A first conversation is usually enough to define the potential and the scope of the mandate.