
🔧 Refine your HVAC (CVS) planning for the MCR part with Workswell.ch
Anticipating constraints, controlling costs, meeting deadlines: the Workswell method for structuring your HVAC (CVS) planning on the MCR side, built on the KBOB guide.
Technique

Thanks to our new in-house Workswell development, we offer a smart solution that reuses the existing wiring and makes it easy to integrate modern controllers such as Wago, Beckhoff, Weidmüller, Saia-Burgess PCD3 or other MCR platforms.

A reliable, durable modernisation — and up to 30% cheaper than a conventional replacement.
Example configuration:

👉 Interested? Contact Workswell for a tailored assessment.


Also worth reading

Anticipating constraints, controlling costs, meeting deadlines: the Workswell method for structuring your HVAC (CVS) planning on the MCR side, built on the KBOB guide.

As a specialist in the BACnet protocol, Workswell guarantees the integration of multi-brand solutions for the supervision and automation of HVAC, lighting, energy and security installations.

A Workswell patent makes it possible to replace an asynchronous motor with an EC motor without modifying the existing wiring or the building’s control system, with energy savings of up to 70%.
A first conversation is usually enough to define the potential and the scope of the mandate.